Why us · Factory & quality

Why engineers send us files.

Every upload is read by a production engineer, not a script. You get the stackup problems, the drill conflicts and the impedance risks in writing — while changing them is still free.

Three owned production buildings in Wuping, Fujian. We laminate, drill, plate and test in-house — which is why we can answer a stackup question without forwarding your email to a third party.

15,000 m²Owned facility — 3 buildings
50,000 m²/moFabrication capacity
1,200Part models per month
200+Skilled staff

The review happens before the quote, not after the failure.

  • ✓
    DFM feedback within 24 hoursWritten report from the engineer who will run your job, not a sales rep.
  • ✓
    Impedance verified by TDR, ±5%Coupon tested per lot. Reports ship with the boards.
  • ✓
    Lot-level traceabilityMaterial batch, panel ID and inspection data retained for 5 years.
  • ✓
    NDA-first file handlingEncrypted at rest, access logged per user, deleted on request.
“We review the file before we quote. If your design does not fit our process, we tell you straight — before you spend money on tooling.”FT PCB · Engineering department

What you get back

  • Stackup reviewPDF
  • Drill & annular ring checkPDF
  • Impedance risk flagsPDF
  • Quoted lead time5 – 15 days
Equipment

What runs on the floor.

Every major station from cutting to final assessment, photographed on our own floor. Full equipment list available on request with the factory audit pack.

Automatic cutting machine
Automatic cutting machine
CNC drilling — line 1
CNC drilling — line 1
CNC drilling — line 2
CNC drilling — line 2
Organic conductive film line
Organic conductive film line
LDI full-auto exposure line
LDI full-auto exposure line
CCD solder-mask exposure
CCD solder-mask exposure
Pattern plating line
Pattern plating line
VCP plating line
VCP plating line
Alkaline vacuum etching line
Alkaline vacuum etching line
Automatic silk-screen printer
Automatic silk-screen printer
Immersion tin line
Immersion tin line
CNC router
CNC router
AOI inspection
AOI inspection
AVI inspection
AVI inspection
Flying-probe tester
Flying-probe tester
Impedance tester
Impedance tester
Ion-contamination tester
Ion-contamination tester
Plasma treatment machine
Plasma treatment machine
Final quality check (FQC)
Final quality check (FQC)
Final quality assessment (FQA)
Final quality assessment (FQA)
In-house laboratory
In-house laboratory
2D measuring machine
2D measuring machine
PIM (intermodulation) tester
PIM (intermodulation) tester
Network analyser
Network analyser
Spectrum analyser
Spectrum analyser
Reflectivity tester
Reflectivity tester
Engineering department
Engineering department

All 27 photographs taken on our own floor in Wuping — no stock imagery. The full equipment list ships with the factory audit pack.

Certification

Audited, certified, renewed.

Certificates are available as scanned copies with the audit pack. We ship the relevant cert with every order on request.

ISO 9001Quality management system
IATF 16949Automotive quality management
ULUnderwriters Laboratories recognition
ISO 14001Environmental management
GJB 9001CNational military standard quality system
CQCChina Quality Certification
National High-Tech EnterpriseAccredited R&D-driven manufacturer
Work Safety Level 3Standardised safety management

Click any certificate to enlarge. Scanned copies also ship inside the factory audit pack, and the certificate relevant to your order can travel with the boards.

Process control

How a lot moves through the plant.

1

Incoming material check

Laminate and prepreg verified against the specified brand and batch before release to production.

2

Engineering review

Stackup, drill and impedance targets locked before the first panel is imaged.

3

First article

Microsection and dimensional check on the first panel of every new part number.

4

In-process inspection

IPQC checkpoints at imaging, plating and etching — not just at the end of the line.

5

Automated optical + visual inspection

100% AOI scan, followed by AVI verification on approved workmanship criteria.

6

Electrical & impedance test

Flying-probe or fixture e-test on every board; TDR coupon per lot on controlled-impedance jobs.

7

Final quality check

FQC against the acceptance class you specified, with the report set packed with the boards.

8

Packing & shipment

Vacuum-sealed with desiccant, tracked air freight via DHL / FedEx from Shenzhen or Guangzhou.

File confidentiality

Your design files stay yours.

Customer designs are the most sensitive asset in this industry. Our handling rules are written into the quality system, not just the sales pitch — and access is auditable per user.

Send files under NDA

File handling rules

  • NDA signed before review, on request
  • Encrypted at rest, access logged per user
  • Only your assigned engineer can open the files
  • Deleted 90 days after the project closes
  • Never shared with third parties
Factory audit

Audit us before you qualify us.

On-site visits and video audits are both welcome. We will send the audit pack — certificates, equipment list, process flow and sample reports — within one working day.