Why engineers send us files.
Every upload is read by a production engineer, not a script. You get the stackup problems, the drill conflicts and the impedance risks in writing — while changing them is still free.
Three owned production buildings in Wuping, Fujian. We laminate, drill, plate and test in-house — which is why we can answer a stackup question without forwarding your email to a third party.
The review happens before the quote, not after the failure.
- ✓DFM feedback within 24 hoursWritten report from the engineer who will run your job, not a sales rep.
- ✓Impedance verified by TDR, ±5%Coupon tested per lot. Reports ship with the boards.
- ✓Lot-level traceabilityMaterial batch, panel ID and inspection data retained for 5 years.
- ✓NDA-first file handlingEncrypted at rest, access logged per user, deleted on request.
What you get back
- Stackup reviewPDF
- Drill & annular ring checkPDF
- Impedance risk flagsPDF
- Quoted lead time5 – 15 days
What runs on the floor.
Every major station from cutting to final assessment, photographed on our own floor. Full equipment list available on request with the factory audit pack.



























All 27 photographs taken on our own floor in Wuping — no stock imagery. The full equipment list ships with the factory audit pack.
Audited, certified, renewed.
Certificates are available as scanned copies with the audit pack. We ship the relevant cert with every order on request.






Click any certificate to enlarge. Scanned copies also ship inside the factory audit pack, and the certificate relevant to your order can travel with the boards.
How a lot moves through the plant.
Incoming material check
Laminate and prepreg verified against the specified brand and batch before release to production.
Engineering review
Stackup, drill and impedance targets locked before the first panel is imaged.
First article
Microsection and dimensional check on the first panel of every new part number.
In-process inspection
IPQC checkpoints at imaging, plating and etching — not just at the end of the line.
Automated optical + visual inspection
100% AOI scan, followed by AVI verification on approved workmanship criteria.
Electrical & impedance test
Flying-probe or fixture e-test on every board; TDR coupon per lot on controlled-impedance jobs.
Final quality check
FQC against the acceptance class you specified, with the report set packed with the boards.
Packing & shipment
Vacuum-sealed with desiccant, tracked air freight via DHL / FedEx from Shenzhen or Guangzhou.
Your design files stay yours.
Customer designs are the most sensitive asset in this industry. Our handling rules are written into the quality system, not just the sales pitch — and access is auditable per user.
Send files under NDAFile handling rules
- NDA signed before review, on request
- Encrypted at rest, access logged per user
- Only your assigned engineer can open the files
- Deleted 90 days after the project closes
- Never shared with third parties
Audit us before you qualify us.
On-site visits and video audits are both welcome. We will send the audit pack — certificates, equipment list, process flow and sample reports — within one working day.